The LauderBuild Plan Room allows for online submittal 24/7 from the convenience of your home or office. THIS PERMIT TYPE IS SUBMITTED ONLINE ONLY.
PRIOR TO APPLYING Visit → LauderBuild Plan Room for REQUIREMENTS AND TUTORIALS
INSTRUCTIONS for Online Submittal of UTILITY FRANCHISE Permit Package:
**FIVE (5) MINIMUM SUBMITTAL REQUIREMENTS.**
Guide for First Time Users Click > Step by Step APPLICATION GUIDE
We will accept e-permit applications from City-Registered Utility/Agency Owner (UAO) and Contractors only.
Once your E-Permit application is received by DSD-Engineering Services, it will be processed on a "first-come, first-served" basis. When we have completed the processing, you will be notified via email.
When submitting corrections/revisions, do not resubmit the entire plan set. Only upload the sheets containing changes from the previous submission. Make sure page numbering is EXACTLY the same as the original sheet it is replacing. (select the magnifier glass to select the sheet to replace from the dropdown list)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
(Information must be current per Florida Ch_2019-131):
Click → REGISTRATION GUIDE (for UAO only) Contractors must register through LauderBuild
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
READ FIRST → Permit Application Tips
A. APPLICATION PACKAGE FOR FRANCHISE UTILITY (GAS, ELECTRIC, FIBER/TELECOMMUNICATIONS) PERMIT:
B. APPLICATION PACKAGE FOR COMMUNICATIONS (SMALL CELL/5G) PERMIT
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
REQUIRED INSPECTIONS:
An ENG-ENGINEERING ROUGH inspection will be scheduled automatically for you upon Permit Issuance.
For ENG-ENGINEERING JOBCHECK and ENG-ENGINEERING FINAL inspections, please request by calling 954-828-5191 or via ONLINE SERVICES at LauderBuild
PERMIT CLOSEOUT PROCESS:
APPLICANT TO UPLOAD: As-built drawings to the Engineering Plan Reviewer via a Modification Request:
PDF Filenames "[Permit Number] As-built - [Item Description]"
Quick link How to: LPR Video Tutorial: Modification Request (Revisions & Deferred Submittals)
Include the following:
1. Adobe PDF Format of associated project Bore Logs
2. Restoration photos
3. Plot of Constructed Bore (utilizing Bore Logs) against the Approved Bore Design at permitting (to ensure there are no utility conflicts).
Note: If as-built is Disapproved, City Reviewer will post comments to the record to be responded to by Applicant. If as-built is Approved, City Reviewer will schedule the final engineering inspection based upon inspectors' availability.
**Please do not upload as-built drawings to the permitting system or schedule the final inspection.**
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
QUESTIONS:
Please feel free to contact DSD-Engineering Administration, 954-828-5232, DEngineeringAdmin@fortlauderdale.gov.